GHOST KITCHENS

Tier 1 — Launch Lite (Foundation)

Goal: Stand up a profitable, compliant single brand fast.
Timeline: 4–6 weeks (mostly remote)

Deliverables

  • Concept & brand mini-kit (name, positioning, logo starter, brand voice)

  • Menu engineering v1 (10–18 SKUs), cross-utilization map, target COGS

  • Packaging matrix + 20–60 min delivery holdability test

  • Kitchen flow & station charts (batch, cook-chill, par levels)

  • Core SOPs: prep guides, spec sheets, cook cards, sanitation/allergen

  • Tech setup: POS ↔ aggregator integration, KDS config, order throttling

  • Launch checklist + 14-day promo plan (in-app SEO & offers)

Ops Cadence

  • Weekly 45-min check-in; first 30 days post-launch review

KPIs Tracked

  • COGS %, Avg. Prep Time, AOV, Rating ≥4.6, On-time dispatch ≥95%

Ideal For: First location or first virtual brand inside an existing kitchen.

Tier 2 — Operational Edge (Optimization)

Goal: Improve speed, ratings, and margin; add daypart/LTOs.
Timeline: 8–10 weeks (hybrid: remote + selective on-site)

Deliverables

  • SKU rationalization + upgraded menu engineering v2 (LTO calendar)

  • Waste & variance program; portion control system; yield testing

  • Expo & pickup redesign (driver flow), heat-map dispatch radius

  • Aggregator governance: pricing zones, availability windows, 86 rules

  • Rating-recovery & CX playbook; secret-shop delivery audits

  • Procurement tune-up: spec lock, vendor bids/MDAs, weekly price audit

  • Performance dashboard (order mix, AOV/attachment, CM by channel)

  • Marketing engine: creator seeding, review flywheel, promo calendar

Ops Cadence

  • Weekly 60-min ops review; monthly P&L/COGS deep-dive

KPIs Tracked

  • Prep time –15–25%, COGS –2–4 pts, AOV +8–12%, Rating +0.2–0.4

Ideal For: Operating brands that have traction but inconsistent margin/ratings.

Tier 3 — Scale & Multi-Brand (Growth)

Goal: Build a multi-brand, multi-unit engine with repeatable playbooks.
Timeline: 12–16 weeks (immersive: on-site + remote)

Deliverables

  • Portfolio strategy (1–3 virtual brands): positioning, whitespace, guardrails

  • Production blueprint for volume (batching, cook-chill, overnight programs)

  • Full SOP book & training library (video job aids, role scorecards)

  • Labor model & schedule templates; capacity & throughput modeling

  • Commissary/central kitchen plan (capex, ROI, equipment spec)

  • Channel economics: price testing, fee optimization, contribution margin model

  • Expansion toolkit: site readiness checklist, 30/60/90 market launch playbook

  • Enterprise reporting: unit scorecards, cohort retention, re-order analytics

Ops Cadence

  • Weekly performance council; leadership rhythm (WBR/MBR/QBR)

KPIs Tracked

  • Throughput +20–35%, Unit CM +3–6 pts, OTD ≥97%, Brand rating ≥4.7

Ideal For: Groups targeting multi-unit scale or adding/stacking virtual brands.

Common Add-Ons (any tier)

  • Full creative kit (visual identity, photo/video, menu design)

  • New market launch team (2–4 weeks per market)

  • Bar/bev & dessert virtual brand bolt-ons

  • Commissary build & equipment procurement

  • Data & BI integration to finance stack

Note: Pricing can be fixed-fee or retainer + performance bonus (tied to CM, ratings, or AOV). If you want, I can format this as a one-page sell sheet or website section with CTAs.

CATERING

Tier 1 — Drop-Off Essentials (Foundation)

Goal: Reliable, profitable drop-off catering for corporate and small events.
Typical setup: 2–4 weeks (mostly remote)

Deliverables

  • Tiered menus (boxed meals, platters, breakfast/lunch) with target COGS%

  • Portion guides, allergen matrix, reheating/finishing instructions for clients

  • Production schedule, batch plans, par levels, label/pack standards

  • Load-out checklist, routing & timing maps, hot-hold/cold-chain plan (HACCP logs)

  • Proposal/contract & invoice templates, deposit/cancellation terms

  • Basic CRM & order pipeline (tastings policy, follow-ups, re-order offers)

  • Packaging matrix (eco/durable) + branding stickers and menu inserts

  • Weekly KPI snapshot + 30-minute ops review

KPIs

  • On-time delivery ≥ 97%, COGS within target, NPS/ratings ≥ 4.6, re-order rate ↑

Ideal for: Corporate drop-offs, meetings, trainings, recurring office accounts.

Tier 2 — Staffed Events & On-Site Service (Operational Edge)

Goal: Level up to staffed buffets, stations, and small receptions with polish.
Typical setup: 6–8 weeks (hybrid: remote + selective on-site)

Deliverables

  • Service playbooks: buffet/station standards, passed apps, captain binders

  • Run-of-show timelines, BEOs, site walk templates, rain/backup plans

  • FOH/BOH staffing models, call sheets, uniforming, tip/gratuity policies

  • Portable kitchen layouts, equipment lists, fuel/power/water plans

  • Rentals coordination (china/glass/flatware/linens), vendor SOPs & COIs

  • Bar packages (beer/wine/signature cocktails) + local ABC guidance

  • Presentation & garnish standards; tasting protocols & feedback loop

  • Upsell ladder (premium sides, dessert, beverage, décor) + price guardrails

  • Monthly P&L review and job-costing postmortems

KPIs

  • Labor % within plan, incident-free rate, upsell per guest ↑, guest ratings ≥ 4.7

Ideal for: Weddings lite, nonprofit galas, campus events, social receptions.

Tier 3 — Premier Production & Multi-Venue Scaling (Growth)

Goal: High-volume, multi-venue events with repeatable systems and strong margins.
Typical setup: 10–14 weeks (immersive: on-site + remote)

Deliverables

  • Commissary/central-production blueprint (capacity model, cook-chill, make-to-hold)

  • Procurement program: spec lock, vendor MDAs, weekly price audits, substitutions

  • Full SOP & training library (video job aids, role scorecards, safety drills)

  • Advanced logistics: multi-truck dispatch, zone routing, curbside orchestration

  • Enterprise dashboards: job costing, contribution margin by event/channel

  • Sales engine: venue partnerships, corporate agreements, seasonal campaign calendar

  • Quality & risk: HACCP transport audits, COIs, emergency response & incident playbook

  • Leadership cadence: WBR/MBR/QBR, unit scorecards, continuous-improvement loop

KPIs

  • Throughput +20–35%, GM +3–6 pts, on-time ≥ 98%, re-booking rate ↑, shrink ↓

Ideal for: Large corporate/campus programs, multi-day conferences, premium weddings.

Popular Add-Ons (any tier)

  • Full bar service with certified staff; specialty coffee & mocktail stations

  • Décor/florals coordination, rentals management, valet/shuttle logistics

  • Live chef stations (carving, paella, pasta), raw bar & sushi, pastry program

  • Photography/videography partners; venue scouting & booking support

  • Off-season revenue plan (holiday boxes, corporate gifts, heat-and-serve meals)

If you’d like, I can format this as a one-page sell sheet or a web section with CTAs, or tailor menus/KPIs to a specific cuisine and target client.